News
07 January, 2021
The lead times below are correct as of 7th January 2021: Windpost Drawings Service: 1-2 working days from initial […]
News
11 June, 2020
This article covers a number of critical design considerations, namely, windpost design, parapet post design, connection baseplate design, top cleat design and windpost ties.
Case Study
29 August, 2019
Masonry support and restraint products from the Vista Group have been used in a landmark new student accommodation…
08 February, 2019 Case Study
Vista Engineering products are being used extensively at Bath Western Riverside…..
01 October, 2018 News
Wakefield-based manufacturer of steel construction connectors, BPC Building Products Ltd, has joined Vista Engineering, in a move which sees the group strengthen its position in the UK.